A large house construction in East Ryde built with top-level viewing and entertaining area. The concrete deck was built on top of the lounge and living areas below.
Water tightness is critical for this project, Bldcare arranged the following specification and referred skilled contractors to carry out works to complete this waterproofing solution.
Bldcare Flexiprime was used followed by a 3 coat application of our Flexiclad PU-WB liquid membrane. To reinforce the system we used Sontara polyester matting throughout the entire deck within the membrane. This specification added extra strength and protection against future movement and is highly recommended in exposed balconies and podium decks. A certificate and 10 year warranty was provided on this system.